IIP Announcement

IIP AnnouncementWe are pleased to announce that after 9 months of hard work we have been accredited as an Investors in People (IIP) organisation.

Since 1991 IIP has set the standard for better people management, defining what it takes to lead, support and manage people well for sustainable results. IIP is about empowering the talent within the organisation to create greater success.

To get the accreditation we had to take part in a detailed process and provide the auditors with as much information as possible, so they could measure our performance based on the IIP framework which is organised around nine key indicators of high performance, each with three underpinning themes.

Successful accreditation against the IIP Standard is the sign of a great employer, an outperforming place to work and a clear commitment to sustainability, so we are very proud to have passed this assessment, and to now be fully accredited until 2020.

Do you suffer from geriatric building syndrome?

The challenge of prolonging the life of aging buildings

Without heating or hot and cold water a building is uninhabitable. That’s why today’s Managing Agent has to manage the potential threat of losing critical services. Yet, escalating service charges are a common and constant worry which means that you can’t just spend your way out of the problem. Often it comes down to postponing the inevitable replacement programme, by keeping heating and hot water assets in service for as long as possible, whilst also minimising costs.

Unfortunately, some Managing Agents discover the hard way that taking on local, poorly qualified tradespeople or domestic engineers to maintain their aging and complex commercial systems, is the wrong way to minimise costs. Don’t fall into this trap. All too often the end result is a botched job, which will cause problems elsewhere in the system, affecting many people and racking up significant service charge costs.

Seek out the potential dangersDo you suffer from geriatric building syndrome?

Being proactive is essential. That’s because many heat networks and water systems designed to last 50 years, in reality have been in service for close to 100 years. Inevitably problems crop up and, if left, they can potentially become catastrophic.

In my experience, these common hidden issues can lead to major problems:

  • Crossovers, with cold water in the hot pipes or vice versa, caused by poor understanding of the system and pressures.
  • Long term air and sludge in systems and unchecked storage tanks.
  • Changes in demand – fitting pumps, extra radiators and showers – without considering the impact across the system.
  • Unresolved leaks leading to constant top-ups with untreated water.
  • Low hot water temperatures, blocked waterways and poor hygiene control leading to legionella problems.
  • Uncontrolled apartment works that also miss opportunities to replace pipework and valves.
  • Valves that don’t work! This means drain downs for planned or emergency work in most instances will affect the whole building and all services.

Plan for the best, expect the worst

When dealing with old buildings my advice to you would be, plan for the best and expect the worst.

Here’s what you should do:

  • Don’t think that a ‘head in the sand’ approach will work. It’ won’t.
  • Instead, select a maintenance company that has the skills and expertise to provide you with a bespoke maintenance schedule for your buildings.
  • Ensure your maintenance company can identify the pressure points and dangers within the existing infrastructure, and attend at short notice 24/7/365 when that inevitable crisis hits.

Avert a crisis with 24/7 emergency responseDo you suffer from geriatric building syndrome?

Flats are valuable assets, so an emergency should only ever be just that, an emergency. It mustn’t be allowed to become a nightmare. As the emergency is spotted, it must trigger a swift response any time of the day or night, 365 days of the year, regardless of whether it’s The Sabbath, Hanukkah, Diwali or Christmas Day. Speedy solutions keep residents happy!

Take control with on-call support:

  • Emergency service should be embedded into your contract, with KPIs reported to you each month, should you wish.
  • You should expect, and get, a swift response day or night, 365 days per year.

Keep control of costs – Avoid the FTT

With these aging buildings, keeping costs within the maintenance budget can sometimes seem an impossible task. When problems arise and quotes come rolling in, it’s easy for the costs to spiral out of control. Overspends will be scrutinised by the residents and if not fully justified, will cause an even greater problem.

Your cost-control checklist:

  • Choose a proactive maintenance company that will assist in budget planning by prioritising works or giving advance notice of funds needed for future works.
  • Find a company that’s committed to preserving the condition of plant and systems, and identifying energy saving measures.
  • Make sure that you receive a complete breakdown of all costs encountered.
  • Demand that all maintenance costs are fully justified and over-expenditure is limited, or eradicated.
  • Consider insurance which is available to cover this risk.

Solve complex issues with experienced engineers

Be certain you know the difference between engineers and experienced engineers by using this ‘tick box’ exercise to select the best of the best:Do you suffer from geriatric building syndrome?

  • Are they knowledgeable enough to ignore the obvious and identify the root cause of an issue?
  • Are they technically competent to find safe practical solutions to complex problems?
  • Are they multi-skilled, so if they discover the heating failure they’ve responded to was actually caused be an electrical failure, they can handle that safely too?
  • Are they commercially experienced to consider the long term implications and cost-benefit of any fix?

A specialist maintenance partner, like DMG Delta, with proven ability to support mansion blocks and whose engineers tick all these boxes, is the key to keeping your building alive.

“These mansion blocks which line many of London’s residential streets may look grand, but often the communal heating and hot water systems which are at the heart of the building have far exceeded their ‘best before’ dates. With upgrades potentially costing millions, and the residents reluctant to foot the bill, it’s often preferable to work with what you’ve got – whether it’s aging boiler plant or old heat distribution and water systems.” 

Dave Collins, Contracts Manager at DMG Delta.

 

 

Holborn fire highlights how vital emergency evacuation & business continuity plans are!

holborn fireThe fire which started as an electrical fault in a well maintained Victorian tunnel beneath the Kingsway on Wednesday 1st April burned until the Good Friday.  This fire damaged an eight-inch gas main, which ruptured further fuelling the fire resulting in flames and smoke coming out of manhole covers in the road above.  Modern technology proved itself in the use of infra-red images of hot spots from the National Police Air Service helicopter and live images in the tunnel using the Met Police’s explosives robot.

It caused about 5,000 people to evacuate from various buildings and roadways in the area and is estimated that approximately 100 businesses were affected as well as thousands of tenants.  UK Power stated that over 3,000 people were affected by the power outage that for some continued until Good Friday.

Although the London emergency services and UK Power Network, National Grid and local councils acted together very successfully to contain the fire and extinguish what could have been a disaster for London, it is a warning to all London’s businesses and managed properties to have plans in place to protect the occupants, their property and businesses.

What should be in place?

Firstly a Fire Risk Assessment followed by a Fire Emergency Plan; these ensure that all the risks involving possible fires have been identified, with control measures (either in place or planned) and a plan of how everyone’s safety will be ensured.  The Emergency Plan may have total evacuation, partial or to stay put until the Fire Brigade decide otherwise and importantly tested to be usable.  This is the responsibility of the person ultimately in charge of the building to make sure this is in place.

Secondly, what happens if the ‘event’ continues on for days, weeks or months?  This is where the Business Continuity Plan comes into play.  Scenarios such as this fire are planned out with business responses that enable the business to continue functioning until everything is restored.

If you do not have these in place for either your business or a managed property (with more than one dwelling) then you need one – call Jane for advice on 01279 810125 or email her at janep@dmgdelta.co.uk.

For details regarding our H&S services that we offer to clients then please click here.

Electricity - Friend or Foe?

In today’s age everyone has a house full of electrical gadgets, equipment and tools. We might hear folk moaning about the gadgets, especially when they plug2 stop working, but all in all we really are reliant on electricity – life without it would be hard!

There is no doubt that in the home electrical faults are the top cause of fires, which is the opposite of fires at work (this is because at work equipment and circuits get tested – at home they generally are not).

During 2011/12 there were 37,601 accidental fires of electrical origin and 244 deaths! Of this 11,954 were cooking appliances, 2,899 electrical supply, 1,083 washing machines and tumble driers, 767 lighting and 475 dishwashers!

What is not available is the number of fires caused by chargers overheating, there is certainly records of these being the cause of some fires.

I hope we all know the dangers of electricity and no-one has any of these culprits in their home – if you have then get rid today!

Faulty PlugEven extension boards are unsafe – quote I heard the other day – they are supposed to be a temporary solution not a permanent one! If you are going to have an extension board in situ for a length of time then make sure it is fused, and perhaps even surge protected into an RCD socket.

If you find a fault at home, but more especially at work then unless you are employed as a qualified electrician then you must not attempt to repair it! Either call an electrician or take it to the dump.

If you do see someone experiencing an electrical shock then you need to know what to do. The electricity will have found a route through the body to ground – don’t add yourself into this circuit!

DO NOT touch the person until you are sure the electricity is off, otherwise there will be two casualties.

Use something that is not conductive (a wooden broom would be good), to move the electrical items away from the person.

If they are conscious take them to hospital (even when they say they don’t need to), as electricity will track through the body until it finds ground. This could mean going through the heart – there may not be any pain or other symptoms but the organs could still be burnt.

If they are not conscious call 999 or 112 as this will be an emergency!

Overloaded Plug

Home safety is as important as office safety! 
Don’t get paranoid about electricity,
But do make sure you have control measures in place,
And know what to do to make your family safe!

DMG Delta - Site Surveys

survey-clipart-1

When an opportunity is received at DMG Delta we offer you a free site survey, carried out by one of our highly qualified and knowledgeable members of staff.

The site survey is part of our opportunity process that we feel is beneficial not only to us, but also to you!

When attending site our member of staff will record down full details of all assets on site, they take a full overview of the plant room and note any causes for concern.

A standard site survey will take between 1-2 hours dependent on the size of the building and the complexity of the plant on site, this also gives us the perfect opportunity to meet with the client direct and any on site staff e.g. Porters.

Once we have undertaken the site survey we can then compile an accurate and detailed proposed maintenance program for that site. If we feel that there are any projects works required, for example – boiler replacements then we can also issue you with a quote for these works.

Our aim at DMG Delta is to prolong the life of your assets on site, and we believe that providing you with a bespoke planned maintenance program is the first step in achieving this goal.

For further details, or to arrange your free site survey then please contact us on the following telephone number – 01279 810100.