<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Case Studies Archives - DMG Delta</title>
	<atom:link href="https://dmgdelta.co.uk/category/case-studies/feed/" rel="self" type="application/rss+xml" />
	<link>https://dmgdelta.co.uk/category/case-studies/</link>
	<description></description>
	<lastBuildDate>Thu, 04 Dec 2025 16:08:22 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://dmgdelta.co.uk/wp-content/uploads/2024/09/cropped-DMG-favicon-32x32.png</url>
	<title>Case Studies Archives - DMG Delta</title>
	<link>https://dmgdelta.co.uk/category/case-studies/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Restoring Reliable Heating Circulation</title>
		<link>https://dmgdelta.co.uk/circulation-croydon/</link>
		
		<dc:creator><![CDATA[Sarah Fowke]]></dc:creator>
		<pubDate>Thu, 04 Dec 2025 11:03:01 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmgdelta.co.uk/?p=5625</guid>

					<description><![CDATA[<p>Croydon</p>
<p>The post <a href="https://dmgdelta.co.uk/circulation-croydon/">Restoring Reliable Heating Circulation</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_0 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_0">
				<div class="et_pb_column et_pb_column_3_5 et_pb_column_0  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_cta_0 et_pb_promo  et_pb_text_align_center et_pb_bg_layout_dark">
				
				
				
				
				<div class="et_pb_promo_description"><h2 class="et_pb_module_header">Case Study</h2></div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_2_5 et_pb_column_1  et_pb_css_mix_blend_mode_passthrough et-last-child et_pb_column_empty">
				
				
				
				
				
			</div>
				
				
				
				
			</div>
				
				
			</div><div class="et_pb_section et_pb_section_1 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_1">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_2  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_0  et_pb_text_align_left et_pb_bg_layout_dark">
				
				
				
				
				<div class="et_pb_text_inner"><h1>Residential Development in Croydon</h1>
<p><span style="color: #000000;"><strong>Type of Work:</strong> </span><span style="color: #000000;">Resolution of Complex Heating Circulation Issues: </span><span style="color: #000000;">d</span><span style="color: #000000;">iagnostics, </span><span style="color: #000000;">removed air locks, </span><span style="color: #000000;">rebalanced flow, improved water quality.</span></p>
<p><span style="color: #000000;"><strong>Building Size:</strong> 50+ Apartments</span></p>
<p><span style="color: #000000;"><strong>Our Impact:</strong> </span></p>
<ul>
<li data-start="209" data-end="281">
<p data-start="211" data-end="281"><span style="color: #000000;">Stabilised heating and hot water across all blocks, reducing outages</span></p>
</li>
<li data-start="282" data-end="353">
<p data-start="284" data-end="353"><span style="color: #000000;">Corrected reverse circulation and restored proper hydraulic balance</span></p>
</li>
<li data-start="354" data-end="419">
<p data-start="356" data-end="419"><span style="color: #000000;">Improved system water quality to protect plant and efficiency</span></p>
</li>
<li data-start="420" data-end="504">
<p data-start="422" data-end="504"><span style="color: #000000;">Increased system reliability and confidence for residents and the managing agent</span></p>
</li>
</ul></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div><div class="et_pb_section et_pb_section_2 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_2">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_3  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_1  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h2>The Challenge</h2></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_2  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>A modern 50+ apartment development in Croydon (completed c.2020) was experiencing repeated issues with its low carbon communal heating system. Residents were dealing with intermittent heating and hot water outages, driven by significant air locks within the distribution pipework serving all apartments.</p>
<p>When DMG Delta first attended site, the lack of “as installed” drawings made it difficult to trace the pipework layout and identify key venting points. The system had likely been drained down before our involvement, allowing air into the pipework and affecting the network hydraulics. This caused:</p>
<ul>
<li>Repeated air locks</li>
<li>Flow imbalances between blocks</li>
<li>Reverse circulation, where one block’s pump overpowered another and pushed water in the wrong direction</li>
</ul>
<p>As we investigated further, it also became clear the system didn’t have a structured water treatment regime in place to protect system assets and maintain efficiency. Water quality was found to be substandard, with high dissolved copper, which may have contributed to the failure of a boiler heat exchanger.</p></div>
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_4  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_0">
				
				
				
				
				<span class="et_pb_image_wrap "><img fetchpriority="high" decoding="async" width="768" height="384" src="https://dmgdelta.co.uk/wp-content/uploads/2025/12/coppice-yard-blue-sky-mail-768x384-1.png" alt="" title="coppice-yard-blue-sky-mail-768x384" srcset="https://dmgdelta.co.uk/wp-content/uploads/2025/12/coppice-yard-blue-sky-mail-768x384-1.png 768w, https://dmgdelta.co.uk/wp-content/uploads/2025/12/coppice-yard-blue-sky-mail-768x384-1-480x240.png 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 768px, 100vw" class="wp-image-5632" /></span>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div><div class="et_pb_section et_pb_section_3 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_3">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_5  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_3  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h2>Our Solution</h2></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_4  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner">With confidence in the heating system declining, the managing agent asked DMG Delta to review the system and advise on how to reinstate reliability and restore proper operation.</p>
<p>Following an initial exploratory site visit, our technical engineering team set out a clear plan to stabilise services and correct the underlying causes:</p>
<ul>
<li>Replaced multiple automatic air vents across the site to expel trapped air and reduce recurring air locks</li>
<li>Monitored and balanced pump speeds using specialist flow rate equipment to correct reverse flow and restore stable circulation between blocks</li>
<li>Flushed and chemically cleaned the system to improve water quality and protect plant equipment</li>
<li>Diagnosed boiler damage and arranged for a replacement heat exchanger to be fitted.</li>
</ul>
<p>Throughout the works, the team took a methodical approach and kept services running wherever possible. Even without original commissioning records, our engineers combined practical experience with on-site testing to rebuild an accurate picture of how the system was behaving and then bring it back into balance.</div>
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_6  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_1">
				
				
				
				
				<span class="et_pb_image_wrap "><img loading="lazy" decoding="async" width="2560" height="1440" src="https://dmgdelta.co.uk/wp-content/uploads/2025/12/image1-coppice-scaled.jpg" alt="" title="image1 coppice" srcset="https://dmgdelta.co.uk/wp-content/uploads/2025/12/image1-coppice-scaled.jpg 2560w, https://dmgdelta.co.uk/wp-content/uploads/2025/12/image1-coppice-1280x720.jpg 1280w, https://dmgdelta.co.uk/wp-content/uploads/2025/12/image1-coppice-980x551.jpg 980w, https://dmgdelta.co.uk/wp-content/uploads/2025/12/image1-coppice-480x270.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" class="wp-image-5630" /></span>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div><div class="et_pb_section et_pb_section_4 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_4">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_7  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_2">
				
				
				
				
				<span class="et_pb_image_wrap "><img loading="lazy" decoding="async" width="2560" height="1707" src="https://dmgdelta.co.uk/wp-content/uploads/2025/11/AdobeStock_894613791-1-scaled.jpeg" alt="" title="Handsome technician using a holographic tablet to read electric meters in a futuristic smart home." srcset="https://dmgdelta.co.uk/wp-content/uploads/2025/11/AdobeStock_894613791-1-scaled.jpeg 2560w, https://dmgdelta.co.uk/wp-content/uploads/2025/11/AdobeStock_894613791-1-1280x854.jpeg 1280w, https://dmgdelta.co.uk/wp-content/uploads/2025/11/AdobeStock_894613791-1-980x653.jpeg 980w, https://dmgdelta.co.uk/wp-content/uploads/2025/11/AdobeStock_894613791-1-480x320.jpeg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" class="wp-image-5493" /></span>
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_8  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_5  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h2>The Result</h2></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_6  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>The development’s low carbon, high efficiency heating asset was reinstated to benefit residents and key stakeholders.</p>
<p>Heating and hot water services were stabilised across all blocks, with:</p>
<ul>
<li>Air cleared from the network</li>
<li>Flow rebalanced and reverse circulation corrected</li>
<li>Water quality significantly improved, helping protect the plant equipment and support efficient operation</li>
</ul>
<p>We also provided the managing agent with clear recommendations to prevent recurrence, including the need for a full recommissioning of the system to secure long-term reliability.</p>
<p>The end result was a restored, fully operational communal heating system, better protected against future breakdowns and inefficiencies, and renewed peace of mind for both residents and the managing agent.</p></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div><div class="et_pb_section et_pb_section_5 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_5">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_9  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_testimonial et_pb_testimonial_0 clearfix  et_pb_text_align_left et_pb_bg_layout_light et_pb_testimonial_no_image">
				
				
				
				
				
				<div class="et_pb_testimonial_description">
					<div class="et_pb_testimonial_description_inner"><div class="et_pb_testimonial_content">“Walking in without as-installed drawings was like fault-finding with half the map missing, and residents were the ones feeling it with intermittent heating and hot water. We worked step by step, clearing trapped air, proving the reverse flow and rebalancing the pumps until the system was working properly again. With the water back in shape, the network stayed stable and residents stopped chasing outages.”</div></div>
					<span class="et_pb_testimonial_author">DMG Delta</span>
					<p class="et_pb_testimonial_meta"><span class="et_pb_testimonial_position">Engineer</span></p>
				</div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div><div class="et_pb_section et_pb_section_6 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_6 et_animated">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_10  et_pb_css_mix_blend_mode_passthrough et-last-child" id="CaseStudies">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_7  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h2>Our Case Studies</h2></div>
			</div><div class="et_pb_with_border et_pb_module et_pb_blog_0 dt-blog-equal-height et-custom-read-more-text et_pb_blog_grid_wrapper et_pb_bg_layout_light">
					<div class="et_pb_blog_grid clearfix ">
					
					
					
					
					<div class="et_pb_ajax_pagination_container">
						<div class="et_pb_salvattore_content" data-columns>
			<article id="post-5625" class="et_pb_post clearfix et_pb_blog_item_0_0 post-5625 post type-post status-publish format-standard has-post-thumbnail hentry category-case-studies">

				<div class="et_pb_image_container"><a href="https://dmgdelta.co.uk/circulation-croydon/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://dmgdelta.co.uk/wp-content/uploads/2025/12/coppice-yard-blue-sky-mail-768x384-1-400x250.png" alt="Restoring Reliable Heating Circulation" class="" srcset="https://dmgdelta.co.uk/wp-content/uploads/2025/12/coppice-yard-blue-sky-mail-768x384-1.png 479w, https://dmgdelta.co.uk/wp-content/uploads/2025/12/coppice-yard-blue-sky-mail-768x384-1-400x250.png 480w " sizes="(max-width:479px) 479px, 100vw "  width="400" height="250" /></a></div>
														<h2 class="entry-title">
													<a href="https://dmgdelta.co.uk/circulation-croydon/">Restoring Reliable Heating Circulation</a>
											</h2>
				
					<div class="post-content"><div class="post-content-inner"><p>Croydon</p>
</div><a href="https://dmgdelta.co.uk/circulation-croydon/" class="more-link">read more</a></div>			
			</article>
				
			<article id="post-853" class="et_pb_post clearfix et_pb_blog_item_0_1 post-853 post type-post status-publish format-standard has-post-thumbnail hentry category-case-studies">

				<div class="et_pb_image_container"><a href="https://dmgdelta.co.uk/dorset_house_nw1/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://dmgdelta.co.uk/wp-content/uploads/2024/12/DMG-Website-Page-Headers-2-400x250.png" alt="Deluged Energy Centre" class="" srcset="https://dmgdelta.co.uk/wp-content/uploads/2024/12/DMG-Website-Page-Headers-2.png 479w, https://dmgdelta.co.uk/wp-content/uploads/2024/12/DMG-Website-Page-Headers-2-400x250.png 480w " sizes="(max-width:479px) 479px, 100vw "  width="400" height="250" /></a></div>
														<h2 class="entry-title">
													<a href="https://dmgdelta.co.uk/dorset_house_nw1/">Deluged Energy Centre</a>
											</h2>
				
					<div class="post-content"><div class="post-content-inner"><p>Dorset House, London</p>
</div><a href="https://dmgdelta.co.uk/dorset_house_nw1/" class="more-link">read more</a></div>			
			</article>
				
			<article id="post-868" class="et_pb_post clearfix et_pb_no_thumb et_pb_blog_item_0_2 post-868 post type-post status-publish format-standard hentry category-case-studies">

				
														<h2 class="entry-title">
													<a href="https://dmgdelta.co.uk/bank-house-ilford/">Planned Maintenance</a>
											</h2>
				
					<div class="post-content"><div class="post-content-inner"><p>Bank House, Ilford</p>
</div><a href="https://dmgdelta.co.uk/bank-house-ilford/" class="more-link">read more</a></div>			
			</article>
				</div><div><div class="pagination clearfix">
	<div class="alignleft"><a href="https://dmgdelta.co.uk/category/case-studies/feed/page/2/?et_blog" >&laquo; Older Entries</a></div>
	<div class="alignright"></div>
</div></div></div>
					</div>
					 
				</div><div class="et_pb_module et_pb_code et_pb_code_0">
				
				
				
				
				<div class="et_pb_code_inner"><script>
(function ($) {
  $(document).on("ready ajaxComplete", function () {
    $(".et-custom-read-more-text .et_pb_post a.more-link").html("Read More");
  });
})(jQuery);
  </script></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div><div class="et_pb_section et_pb_section_7 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_7">
				<div class="et_pb_column et_pb_column_3_5 et_pb_column_11  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_8  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1>Data Energy</h1></div>
			</div><div class="et_pb_module et_pb_cta_1 et_pb_promo  et_pb_text_align_center et_pb_bg_layout_dark">
				
				
				
				
				<div class="et_pb_promo_description"><h2 class="et_pb_module_header">Seamless solutions for metering, billing, energy procurement, and data collection, delivering better services to your residents</h2></div>
				<div class="et_pb_button_wrapper"><a class="et_pb_button et_pb_promo_button" href="/">Find out more</a></div>
			</div>
			</div><div class="et_pb_column et_pb_column_2_5 et_pb_column_12  et_pb_css_mix_blend_mode_passthrough et-last-child et_pb_column_empty">
				
				
				
				
				
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/circulation-croydon/">Restoring Reliable Heating Circulation</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Deluged Energy Centre</title>
		<link>https://dmgdelta.co.uk/dorset_house_nw1/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 12 Apr 2022 08:52:41 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=853</guid>

					<description><![CDATA[<p>Dorset House, London</p>
<p>The post <a href="https://dmgdelta.co.uk/dorset_house_nw1/">Deluged Energy Centre</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_8 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_9 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_8">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_13  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_9  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title"><span style="color: #ff9900;">Energy centre deluged following record-breaking flash flooding</span></h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_0 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_10  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h4><span style="color: #3c3c3b;"></span></h4>
<h4><span style="color: #3c3c3b;"></span></h4>
<h4><span style="color: #3c3c3b;">Dorset House, London</span></h4>
<p>&nbsp;</p>
<p>As we slowly awaken to the reality of climate change, we are seeing extreme weather conditions become more frequent. What would have been viewed as a “once in a hundred-years” event now perhaps does not appear so extraordinary.</p>
<p>Although it is difficult to link individual weather incidents directly to climate change, analysists have warned that global warming is increasing the intensity of rainfall in UK. The flash flooding seen in London last week was a prime example.</p>
<h4></h4>
<h4><span style="color: #ff9900;">Overview</span></h4>
<p>Dorset House is a Grade II listed building constructed in the thirties. Architecturally, it reflects all the vernacular of the time. Consisting of 185 flats, with underground parking and street level shops, this imposing building is a well know landmark in the Marylebone area of London.</p>
<p>The building benefits from centralised services, including a subterranean energy centre hidden below the art deco masterpiece. Most residents probably are not aware of the energy centre’s existence, and perhaps the supply of heat and hot water has always been a bit of a mystery.</p>
<p>The art of running a building such as this is to maintain services so efficiently that those using them have little reason to ask questions, simply taking the principle for granted. Dorset House has a team of on-site personnel who keep the building running 24/7/365. This service is led by the Estate Manager, Jimmy.</p>
<p>&nbsp;</p>
<h4><span style="color: #ff9900;">Challenges Faced</span></h4>
<p>On Monday 12th July 2021, on what would normally be the height of the British summer, London received a month’s worth of rain in a single day. Initially this was not considered a particular threat to the building, until front desk received a report of low water temperatures. This was escalated to the Estate Manager, who went down to check the energy centre.</p>
<p>On accessing the energy centre, the Estate Manager discovered the entire plant room was flooded and much of the critical plant submerged. As with all complex installations, the plant had safety features that had shut the system down safely to protect life and property.</p>
<p>Recognising the situation, the Estate Manager invoked the Disaster Recovery Plan and requested support from DMG Delta. The request was received out of normal business hours, and our emergency response team were already attending similar requests from clients facing critical service failures due to the flooding.</p>
<p>The On-Call Manager at the time was already aware of mounting issues in the area, so a call from another building was almost expected. Resources were reviewed and diverted to the property to see what could be done.</p>
<p>&nbsp;</p>
<h4><span style="color: #f39200;">Our Impact</span></h4>
<p>On attendance, our engineer reviewed the now fully submerged installation to ensure the area was safe. There was little that could be done safely at this time due to the catastrophic nature of the flooding, other than to wait for the water to be pumped out by the fire brigade. Therefore, the decision was made to reattend the following morning.</p>
<p>The On-Call Manager began to escalate awareness of the situation internally and by morning a taskforce of senior management was discussing the options available. This included calling all stakeholders to alert them of the cataclysmic nature of the damage and the short-term impact that might apply with service disruption.</p>
<p>These key steps brought senior decision makers to the fore of the process, allowing sanctioning of the works to flow quickly and effectively. Engineers determined what was required to reinstate the minimum service to the building as quickly as possible, buying a bit of breathing space for a less reactive reinstatement process.</p>
<p>This was relayed back to the procurement team and parts were sourced from suppliers and manufacturers. Components were couriered across the country and continent to allow for the works to progress. A team of senior engineers prepared the site and once received, the components were commissioned, and a basic heating and hot water service reinstated.</p>
<p>With matters now under control, a strategy was defined for the wider repair of equipment and overall reinstatement of the critical service.</p>
<p>As often applies, there were several unsung heroes in this situation. Our engineers and management team went far beyond what would normally be expected, performing as a cohesive team to minimise disruption to the residents and businesses who are dependent on this crucial service.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_11  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h4><strong>Testimonial</strong></h4>
<p>“This was an Armageddon scenario. The entire building had lost its hot water affecting 300+ residents. The prospect of rapid reinstatement was going to be challenge.</p>
<p>DMG Delta performed nothing other than a miracle limiting the impact on the lives of residents and businesses that are reliant on this critical service.</p>
<p>Within days the building was back up and operating, the service reinstated, and our residents once again had the reliable service they have come to expect.”</p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_9">
				<div class="et_pb_column et_pb_column_1_3 et_pb_column_14  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_3">
				
				
				
				
				<span class="et_pb_image_wrap "><img loading="lazy" decoding="async" width="1600" height="1200" src="https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-1.jpg" alt="" title="Dorser-house-Image-1" srcset="https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-1.jpg 1600w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-1-1280x960.jpg 1280w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-1-980x735.jpg 980w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-1-480x360.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw" class="wp-image-862" /></span>
			</div>
			</div><div class="et_pb_column et_pb_column_1_3 et_pb_column_15  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_4">
				
				
				
				
				<span class="et_pb_image_wrap "><img loading="lazy" decoding="async" width="1600" height="1200" src="https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-2.jpg" alt="" title="Dorser-house-Image-2" srcset="https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-2.jpg 1600w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-2-1280x960.jpg 1280w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-2-980x735.jpg 980w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-2-480x360.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw" class="wp-image-863" /></span>
			</div>
			</div><div class="et_pb_column et_pb_column_1_3 et_pb_column_16  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_5">
				
				
				
				
				<span class="et_pb_image_wrap "><img loading="lazy" decoding="async" width="1200" height="917" src="https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-3.jpg" alt="" title="Dorser-house-Image-3" srcset="https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-3.jpg 1200w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-3-980x749.jpg 980w, https://dmgdelta.co.uk/wp-content/uploads/2022/04/Dorser-house-Image-3-480x367.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1200px, 100vw" class="wp-image-864" /></span>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_10">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_17  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_0_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_0 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/dorset_house_nw1/">Deluged Energy Centre</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Planned Maintenance</title>
		<link>https://dmgdelta.co.uk/bank-house-ilford/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 11 Apr 2022 09:11:48 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=868</guid>

					<description><![CDATA[<p>Bank House, Ilford</p>
<p>The post <a href="https://dmgdelta.co.uk/bank-house-ilford/">Planned Maintenance</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_10 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_11 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_11">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_18  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_12  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">Project works &amp; planned maintenance for an office block in Ilford</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_1 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_13  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>Bank House, Ilford</h3>
<p>&nbsp;</p>
<h4>Overview</h4>
<p><span>Bank House is a three storey office building located in Ilford, Essex and is currently owned and managed by Edwards Duthie Solicitors, however had been previously managed by Glenny (an existing client of ours) and our involvement at the time was for the boiler room only.</span></p>
<h4></h4>
<h4>Situation</h4>
<p><span>Edwards Duthie Solicitors recently decided to take over the management of the building themselves and we were contacted by the Facilities Manager to arrange a site meeting and discuss the contract going forward</span></p>
<h4></h4>
<h4>Our Impact</h4>
<p>Edwards Duthie Solicitors carried out extensive refurbishment works to the ground and first floors of the office building. DMG Delta were asked to install the air-conditioning and carry out repairs to the fan coil units.<br />Following the completion of the refurbishment DMG Delta were then offered the maintenance contract for the whole building, comprising of mechanical services, air-conditioning services, water treatment hygiene and specialist services.</p>
<p>We now have a very good working relationship with the Facilities Manager on site and hope that this will be one that lasts for the foreseeable future.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_14  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h4><strong>Testimonial</strong></h4>
<p>“The refurbishment works given to DMG Delta were not only complex but needed careful planning with other trades on site.</p>
<p>This was achieved in extremely difficult working conditions, to a high standard within the time frame given.</p>
<p>My personal thanks to Peter Luxford and Lee Plant for pulling out all the stops and the professionalism they showed.”</p>
<p><strong>Kevin Goodchild, Facilities Manager, Edwards Duthie Solicitors</strong></p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_12">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_19  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_1_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_1 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/bank-house-ilford/">Planned Maintenance</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Emergency Call-Out</title>
		<link>https://dmgdelta.co.uk/parkgate-aspen-greater-london/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 10 Apr 2022 09:15:25 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=874</guid>

					<description><![CDATA[<p>Parkgate Aspen, Greater London</p>
<p>The post <a href="https://dmgdelta.co.uk/parkgate-aspen-greater-london/">Emergency Call-Out</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_12 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_13 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_13">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_20  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_15  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">Emergency Call-Out</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_2 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_16  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>Parkgate Aspen, Greater London</h3>
<p>&nbsp;</p>
<h4>Situation</h4>
<p>DMG Delta received a callout from Kathryn at Parkgate Aspen on Thursday 15th October 2015 at 12.45pm. The call was to report a leak which was audible from the riser cupboard. Kirsty and Elspeth, Service Coordinators raised a job and tasked engineer Dave Fulford.</p>
<p>The engineer arrived on site at 2.13pm. He made an assessment on arrival and phoned through to the office. Due to the extent of works and decisions to be made our supervisor Mick was then tasked to attend and assist with the survey</p>
<h4></h4>
<h4>Our Impact</h4>
<p>Our supervisor arrived on site at 3.30pm and investigated the situation, given the obvious water ingress into the lift shaft the decision was made to isolate the mains water supply to the building to prevent damage to the property.</p>
<p>First thing Friday morning (8.00am) we had 2 engineers (Dave Fulford and Carlton Bygrave) on site to carry out trace and access work.</p>
<p>We requested the managing agents to provide builders to excavate trenches to enable access to the mains water pipe, unfortunately this was not achievable. Therefore at 12.15pm DMG were asked to provide this resource if possible. Contractors were arranged by DMG to attend site and investigate the trench digging requirements. At 3.00pm the contractors stated that a specific machine was required which wouldn’t be available until Saturday. Our engineers however stayed on site and carried out trace and access works in other areas. They also took delivery of potable water storage tanks that had been arranged by DMG office to ensure the residents continued to have a water supply during works.</p>
<p>Saturday morning (8.00am) the 2 x DMG engineers were back on site along with the building contractors to continue with the works.  A trench was dug and the mains water pipe accessed.</p>
<p>DMG had a supervisor arrive on site for 9.00am to assess the current situation and progress.</p>
<p>At 10.00pm Saturday night the works were completed and a temporary mains water supply was in operation. The cold water storage tanks were off hired first thing Monday morning to minimise costs.</p>
<p>The pipe that failed resulted in the loss of the critical water service to all flats in the building. DMG Delta’s expeditions and action provided a temporary supply on the same day minimising the inconvenience to the residents on Friday evening and providing a cost effective temporary solution.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_17  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h4><strong>Testimonial</strong></h4>
<p>“Throughout this major issue at Lodge Close, DMG reacted promptly and attended to the problems relevant to the mains failure in a thoroughly professional manner.</p>
<p>They met with clients and insurers at site, explained the issues and remedies and ensured that disruption to residents was kept to a minimum.”</p>
<p><strong>Phillip Cove – Parkgate Aspen</strong></p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_14">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_21  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_2_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_2 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/parkgate-aspen-greater-london/">Emergency Call-Out</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>HIU Maintenance</title>
		<link>https://dmgdelta.co.uk/silkworks-and-silvermill-lewisham/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sat, 09 Apr 2022 09:20:30 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=882</guid>

					<description><![CDATA[<p>Silkworks and Silvermill, Lewisham</p>
<p>The post <a href="https://dmgdelta.co.uk/silkworks-and-silvermill-lewisham/">HIU Maintenance</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_14 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_15 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_15">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_22  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_18  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">HIU Maintenance</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_3 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_19  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>Silkworks and Silvermill, Lewisham</h3>
<p>&nbsp;</p>
<h4>Overview</h4>
<p><span>Silkworks is a prestigious residential complex development consisting of 426 apartments over 7 individual residential blocks with a mix of private and social housing tenants, fed from two centralised energy centres.</span></p>
<h4></h4>
<h4>Situation</h4>
<p><span>DMG Delta were approached by MLM the Managing Agents of the building, and asked to provide Heat Interface Unit (HIU) maintenance proposals for each block.</span></p>
<h4></h4>
<h4>Our Impact</h4>
<p>DMG Delta provided proposals to attend each property and undertake scheduled maintenance to the HIU’s in a single continuous programme of works spread over 4 weeks.</p>
<p>At the end of 2016 the managing agent instructed DMG Delta to undertake servicing of HIU’s throughout the complex, a total of 7 buildings with a mix of 3 differing types of HIU’s. A total of approximately 400 units were serviced over the 4 week period.</p>
<p>Appointment times were arranged with the residents making 20 appointments per day involving 4 engineers to carry out the service attendances. Working with the client and staff on site, provided a high degree of flexibility within the programme where residents had to change plans at the last minute for attendances.</p>
<p>A work sheet tailored for the site was produced by DMG Delta to allow the engineers to record specific information, and to ensure all serviceable items within the HIU’s were verified as having been serviced.</p>
<p>The DMG Delta supervisor collected daily appointment sheets from the site concierge and distributed between engineers.<br />At the end of each day the completed work sheets were collated by the supervisor, checked and filed. At the end of each week the sheets were delivered to the office for scanning onto our system for record keeping purposes.</p>
<p>A daily email confirmation was sent to MLM listing apartments accessed and services completed along with an overview of any major issues, with photographic back-up.</p>
<p>Daily and weekly reports of service works carried out were provided to the client and any issues or problems that had been identified.<br />Works were completed within the 4 weeks allocated. A total of 374 apartments being successfully accessed and serviced, with any inaccessible flats to be rescheduled when access is available.</p>
<p>What was viewed as a logistical nightmare by the Managing Agents was transformed through careful management and planning into a smooth progression of works that were completed within the defined timescale.</p>
<p>HIU maintenance is a critical requirement of maintaining the efficiency levels on a Heat Network. DMG Delta will aid and support those involved to get the most out of their heat. HIU maintenance varies between manufacturers.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_20  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h4><strong>Testimonial</strong></h4>
<p>“As the new managing agents for the development we were keen to review the arrangements for the ongoing maintenance of this key asset, the HIU.</p>
<p>We contacted DMG to ask for their proposals and were pleased to be able to introduce the programme of works that on the face of it appeared a challenge, however we were reassured by the team at DMG Delta that we could complete this task expeditiously using their proven experience to maintaining large scale multi-building heat networks.</p>
<p>The engineers attending were clearly competent and came equipped with technology to support the reporting process. Full reports were received during the course of the maintenance programme, keeping us up to date on the daily activities.  A post-completion report was provided, and from this we were able to schedule any apartments that required revisiting, or further works.</p>
<p>As Managing Agents we are pleased with DMG Delta’s performance, and have no hesitation in recommending them to others who have similar challenges.”</p>
<p><strong>Rupy Jandu, New Business Manager, Michael Laurie Magar Ltd</strong></p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_16">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_23  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_3_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_3 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/silkworks-and-silvermill-lewisham/">HIU Maintenance</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New Heating Plant</title>
		<link>https://dmgdelta.co.uk/park-mansions-central-london/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 07 Apr 2022 09:38:54 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=887</guid>

					<description><![CDATA[<p>Park Mansions, Central London</p>
<p>The post <a href="https://dmgdelta.co.uk/park-mansions-central-london/">New Heating Plant</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_16 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_17 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_17">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_24  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_21  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">New Heating Plant</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_4 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_22  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>Park Mansions, Central London</h3>
<p>&nbsp;</p>
<h4>Overview</h4>
<p><span>Park Mansions is a prestigious purpose built apartment building, fabulously located opposite Hyde Park, Harvey Nichols and moments from Harrods and Sloane Street.</span></p>
<h4>Situation</h4>
<p><span>DMG Delta first became involved at Park Mansions in mid 2010 when we became the incumbent maintenance contractor for the boiler system and associated plant. It was clear from the outset that the aged plant room installation was on its last legs and that a major replacement was required. Asbestos was present and lengthy disruptions to hot water and heating services unacceptable to the tenants. No on site parking and being surrounded by parking red routes added to the difficulty of the task in hand.</span></p>
<h4>Our Impact</h4>
<p>In 2013 DMG Delta successfully won the competitive tender for the boiler room replacement. Challenged with very poor access, difficult materials logistics and a tight deadline, DMG Delta delivered the project on schedule and on budget. At no point during the project was the hot water off for more than a few hours.</p>
<p>DMG Delta successfully liaised with and coordinated the asbestos removal contractors whilst keeping health and safety a priority. The end result is a highly specified, top end installation that complies with building regulations and will last for years to come.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_23  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h4><strong>Testimonial</strong></h4>
<p>“The works conducted by DMG Delta was to an exceptionally high standard and they were able to accommodate our clients’ needs throughout.</p>
<p>No cost overruns, no service disruptions and no ongoing issues following completion. An exceptional job by DMG Delta.”</p>
<p><strong>Elliott Unsdorfer, Parkgate Aspen</strong></p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_18">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_25  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_4_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_4 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/park-mansions-central-london/">New Heating Plant</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Replacement HV Transformer</title>
		<link>https://dmgdelta.co.uk/international-institute-of-strategic-studies/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 06 Apr 2022 09:47:45 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=901</guid>

					<description><![CDATA[<p>International Institute of Strategic Studies</p>
<p>The post <a href="https://dmgdelta.co.uk/international-institute-of-strategic-studies/">Replacement HV Transformer</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_18 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_19 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_19">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_26  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_24  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">Replacement HV Transformer, HV &amp; LV Switchgear</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_5 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_25  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>The International Institute of Strategic Studies</h3>
<p>&nbsp;</p>
<h4>Situation</h4>
<p>The obsolete equipment was not supported by the original manufacturers. There were no parts available for the existing plant. The old HV transformer was showing severe signs of failure following multiple oil tests.<br />There was a high chance that excess rain fall could have ingressed into the LV switch room with catastrophic consequences.</p>
<p><strong>Impact:</strong> Loss of worldwide business.</p>
<p><strong>Solution:</strong> Supply and install HV transformer, HV &amp; LV switchgear works.</p>
<p><strong>Benefit:</strong> The risk of break-downs has been minimised.</p></div>
			</div><div class="et_pb_module et_pb_text et_pb_text_26  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h4><strong>Testimonial</strong></h4>
<p>“Following the installation of the new HV &amp; LV switchgear over the weekend, I would just like to thank Malcolm for his guidance and assistance during the planning stages of this project.</p>
<p>It was imperative that there were no delays in getting the building powered back up by Sunday evening. Although there were a few issues to start with, the team of workmen worked exceptionally hard to ensure things got back on track as soon as possible.</p>
<p>I would like to say a special thanks to Lee and Peter who worked about the clock to ensure everything ran smoothly. You have two real assets to the company there. Thanks again for all your help.”</p>
<p><strong>David Burns, Building Services Manager, IISS</strong></p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_20">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_27  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_5_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_5 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/international-institute-of-strategic-studies/">Replacement HV Transformer</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Heating Services</title>
		<link>https://dmgdelta.co.uk/chelsea-knightsbridge-london/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 05 Apr 2022 09:48:21 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=905</guid>

					<description><![CDATA[<p>Chelsea &#038; Knightsbridge, London</p>
<p>The post <a href="https://dmgdelta.co.uk/chelsea-knightsbridge-london/">Heating Services</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_20 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_21 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_21">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_28  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_27  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">Heating services to sought after properties in Chelsea</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_6 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_28  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>Chelsea &amp; Knightsbridge, London</h3>
<p>&nbsp;</p>
<h4>Situation</h4>
<p><span>Cadogan Estates has been established for over 250 years and is a renowned property investor and developer, with a large portfolio of commercial and residential properties in Chelsea and Knightsbridge. DMG Delta was asked by Cadogan Estates to deliver Gas Safety Inspections and boiler services to the 250 highly sought after residential properties it owned.</span></p>
<h4>Our Impact</h4>
<p>DMG Delta provided a dedicated management resource to Cadogan Estates, along with a comprehensive service created for each property. Frequent communication with the client through in-house call logging software, made the project run efficiently.</p>
<p>DMG Delta now services much of Cadogan’s residential portfolio, and they’re able to use the 24/7, 365 days year emergency call out service for their entire property portfolio.</p>
<p>A long and successful relationship has been established with Cadogan Estates, and services are consistently delivered on time and to the client’s expectations.</p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_22">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_29  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_6_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_6 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/chelsea-knightsbridge-london/">Heating Services</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mobile Service</title>
		<link>https://dmgdelta.co.uk/the-freud-museum-london/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 04 Apr 2022 09:51:42 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=909</guid>

					<description><![CDATA[<p>The Freud Museum, London</p>
<p>The post <a href="https://dmgdelta.co.uk/the-freud-museum-london/">Mobile Service</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_22 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_23 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_23">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_30  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_29  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">Scheduled and emergency call-out services to take care of every need</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_7 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_30  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>The Freud Museum, London</h3>
<p>&nbsp;</p>
<h4>Situation</h4>
<p>Once the London home of Sigmund Freud and his family, the Freud Museum now houses his study and library preserved in it original state. Alongside these, there’s a host of exhibitions and artifacts that reflect the famous psychologist’s life and pursuits.</p>
<p>Arranged on three levels, the site includes numerous rooms – many that are open to the public. DMG Delta started by completing a thorough survey of the building. Then, we were ready to design a complete and cohesive maintenance programme that resulted in the least amount of disruption to the museum and its visitors.</p>
<h4>Our Impact</h4>
<p>The new maintenance schedule gives the clients more efficient services. It also delivers increased reliability and cost savings.</p>
<p>All work is scheduled to fit around the museum’s events and opening hours. Any emergency is dealt with on a call-our basis.</p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_24">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_31  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_7_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_7 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/the-freud-museum-london/">Mobile Service</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Air Conditioning</title>
		<link>https://dmgdelta.co.uk/queen-ann-street-london/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 03 Apr 2022 10:03:25 +0000</pubDate>
				<category><![CDATA[Case Studies]]></category>
		<guid isPermaLink="false">https://dmg.uk.w3pcloud.com/?p=913</guid>

					<description><![CDATA[<p>Queen Ann Street, London</p>
<p>The post <a href="https://dmgdelta.co.uk/queen-ann-street-london/">Air Conditioning</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><div class="et_pb_section et_pb_section_24 et_pb_with_background et_section_regular" >
				
				
				
				
				
				
				
				
				
			</div><div class="et_pb_section et_pb_section_25 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_25">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_32  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_31  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h1 class="entry-title">An air conditioning design and installation for office block refurbishment</h1></div>
			</div><div class="et_pb_module et_pb_divider et_pb_divider_8 et_pb_divider_position_center et_pb_space"><div class="et_pb_divider_internal"></div></div><div class="et_pb_module et_pb_text et_pb_text_32  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>Queen Ann Street, London</h3>
<p>&nbsp;</p>
<h4>Situation</h4>
<p>In 2002, refurbishment of this 1960s office block began. DMG Delta was brought in to complete the design and installation of a new air conditioning system.</p>
<p>The system had to work over five floors and meet the needs of radically different tenants. We created a team of designers, project managers and installation engineers to work closely with the client’s development team. This partnership ensured communication was ongoing. Budgets and timelines were clearly agreed.</p>
<h4>Our Impact</h4>
<p>All work was completed on time and within budget. The project used high quality materials and its success depended on co-ordination and co-operation. Both were achieved through a single point of contact for all communication.</p>
<p>The installation is now maintained through a DMG Delta Planned Preventative Maintenance package.</p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_26">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_33  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_button_module_wrapper et_pb_button_8_wrapper et_pb_button_alignment_left et_pb_module ">
				<a class="et_pb_button et_pb_button_8 et_pb_bg_layout_light" href="/case_studies_and_testimonials/">Back to Case Studies &amp; Testimonials</a>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div></p>
<p>The post <a href="https://dmgdelta.co.uk/queen-ann-street-london/">Air Conditioning</a> appeared first on <a href="https://dmgdelta.co.uk">DMG Delta</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
